Question 27
You’ll learn how to determine the optimum production plan when mixing is the limiting factor, using throughput per batch and throughput per minute of bottleneck time.
This lesson is part of a paid course
Buy the course to unlock every video lesson and the AI Tutor, plus mock exams with feedback on CIMA courses.
Already bought? Sign in
Ask the AI tutor anything about this lesson
It knows every lesson in the course - explanations, quizzes and clarifications.
In this lesson
- 0:00 Optimising Production With A Bottleneck
- 0:18 Identifying Throughput Per Unit
- 1:32 Calculating Throughput Per Batch
- 2:18 Ranking Products By Mixing Time
- 3:41 Applying The Cafe Contract
- 6:30 Allocating Remaining Mixing Capacity
- 9:30 Final Production Plan Calculated
About this lesson
This PM question demonstrates how to rank products, account for batch sizes and fulfil a minimum cafe order before allocating the remaining 120 minutes to maximise profit. You’ll work through the method step by step and apply it to reach the final production plan: 80 brownies, 30 muffins and 100 cupcakes. This technique is directly relevant to ACCA Performance Management (PM) questions on limiting factors, throughput accounting and optimal resource allocation.
Duration: 10m
Transcript
Every lesson comes with a full searchable transcript - included with the course.